Implementing CIERTO PIM ~Processes from implementation to operation~
- Simple Distribution
In this column, we will introduce the process from the implementation of CIERTO PIM to the start of its operation, by introducing the onboarding flow from the point of contract until the operation is fully up and running. By reading this article, you will gain a deeper understanding of what tasks VPJ, and the client will carry out leading up to the start of "CIERTO PIM" operation.
First and foremost, the critical feature of PIM is not simply registering information in a system but also gaining a solid overall understanding of how the information will be utilized within the entire business process and how it will link with other systems. Therefore, we meticulously interview clients about their current business operations and workflows to understand the actual state of their work. Based on the interview data, we propose a new business process that delivers higher implementation effectiveness. Nothing will change if we just implement CIERTO but not consider the business model of the company, which may affect the compatibility of the system. Hence, we will have customized design tailored to the client's specific operations and industry to increase the effectiveness of system implementation.
Our onboarding support includes careful design, construction, and training tailored to the operations of each individual client, and we accompany you until the operation is smoothly launched. After the launch, the support is handed over to a Customer Success representative who continues to contribute to the client's business growth through ongoing operational support.
1. Full Schedule
2. Construction
To use "CIERTO PIM," we will build a dedicated environment (either on Azure or hardware) for users’company and perform the installation of the CIERTO software.
*This process is completed approximately in two weeks from the date of order.
3. Training
3.1 User Function Training
We will conduct training on the functions of the user panel. It allows users to do what can be done and achievable with CIERTO PIM, which will be useful for the procedures of business requirements definition and application design. Participants in the training session should include those who will operate the system in their duties and those who will determine the operational policies.
Upon request, we also accommodate on-site training tailored to different user groups such as the Product Department or Sales Department at users’ locations. Not only the project leader, but we also encourage all actual users of the system to participate in the training session.
*Assumed to be conducted in meetings lasting 1 to 2 hours per session.
3.2 Administrator Function Training
The Administrator Function Training covers the items that can be configured on the administrator panel and how to set them up. We will explain how to restrict the operational scope for users and how to create the necessary attribute information items for product information management. Since you will be making changes yourselves after operation begins, CIERTO administrators and project managers are required to attend.
Through this training, admin users will be able to add and change settings without the support of VPJ consultants, allowing you to respond quickly to operational changes, including the initial setup and any conversions after system launching.
*Assumed to be conducted in meetings lasting 2 to 3 hours per session.
4. Business Process Definition
Based on the current business operation interviews, we will propose a new workflow using CIERTO.
4.1 Interview and Analysis of Current Business Flow
We will conduct interviews regarding the processes involved in product information management and utilization to understand users’ current business flow.
It includes identifying the departments and players involved in product information management (Product Department, Sales Department, suppliers, external production companies, etc.), the product information being managed, and the methods of integration with external EC sites and core systems users are utilizing.
Based on the interview data, we will create a business flow diagram summarizing responsibilities of each stakeholder in each task, thereby completing the analysis of your current operations.
4.2 Examination of Current Business Challenges and Tasks to be Replaced by CIERTO
Based on the interview results, we will examine and propose how CIERTO can resolve your challenges.
By analyzing the current operations, we can identify what and where the challenges are, and why they exist. For each challenge, we will propose how it can be solved using CIERTO's functions and the new workflow we build, and we will collaborate with your team to determine the best approach for maximizing operational efficiency.
4.3 Proposal for the New Business Flow Using CIERTO
We will propose a product information workflow—from registration to updates and utilization—that is customized for your company.
For the CIERTO implementation flow after integration, we will propose and discuss details such as who, when, and how product information is registered, decide the rules for product information updates, and create the process for product information utilization, using business flow diagrams and system integration flow charts.
In fact, the “optimal” operation depends on the business processes for each company and user. The users need to select specific products each time to retrieve information, and the users need to retrieve information for products that match certain conditions repeatedly have their own optimal usage. We will propose the most suitable method based on each company's business content, challenges, and their current workflow.
4.4 Finalizing the New Business Flow
After consultation, the new business flow will be finalized, and we will proceed with the application design phase. We will create a final business flow diagram summarizing which tasks are performed (product information registration, update, and utilization) by each department/participant and related system, thereby clarifying the vision for operations after CIERTO implementation.
5. Application Design
The design of CIERTO will be carried out based on the observations in the business process definition period. We will define each user's operational and viewing permissions and the items of product information to be managed.
【Items of Application Design】
- Users and Groups: Defining the users who will log into CIERTO and the groups they belong to.
- Product Information Items: Defining the specific items of product information that must be managed in the PIM (e.g., Product Name, Part Number, JAN Code, Product Image, etc.).
- Operational Permissions: Defining operational rights such as creating/deleting products and permissions for viewing, hiding, or editing specific product information fields.
- Product Publication Settings: Defining the conditions for products can be published to each user group (e.g., only shows products that have been approved).
- Output Settings: Defining the product information fields, sorting order, field names, and images to be included in output formats like Excel files or reports.
- Automatic Output Settings: Defining the content of product information has to be automatically exported and the conditions for product output.
- Product Image Linking Settings: Defining the rules and conditions for the automatic linking of products and images.
- Other: Consideration of API and integration with external systems.
6. Application Setting & Data Registration
We will configure CIERTO after finalizing the details mentioned above. VPJ can handle the configuration tasks, or in some cases, the client may choose to perform the setup by themselves. If the client conducts the implementation, we will provide support for the configuration through responsiveness to inquiries and other means.
Once the configuration is completed, initial data registration can be started. In this phase, we will register the products, product information, and product images that will initially be stored in CIERTO. We will proceed after determining which data to register and which method to use for registration. The initial registration can be performed by either VPJ or the client.
*Please note that some registration methods may only be handled by VPJ.
7. Test, Operation and Release
We will have the individuals who will use CIERTO in their daily work conduct a test run. They will perform a final check of the system, verifying that the processes defined during the business definition phase are correct for the full operation by reviewing the screens. If necessary, we will adjust, such as reconfigurations.
In some cases, prior to the test run, VPJ and project manager of the company will hold operational lectures and explanatory sessions for all staff members who will be using the system. We will consult with the manager about whether to conduct these sessions either before or during the project.
8. To sum up...
The above outlines the typical period and content for launching CIERTO PIM. Although the schedule is described as approximately 4 to 5 months, it can sometimes be shortened by 1 to 2 months depending on the specific requirements.
If you would like more detailed information, please contact us via the contact methods below. We would be happy to provide a demonstration using the actual screen and share case studies from other companies utilizing the solution.
-
-
About Us
VPJ Editorial Team
VPJ Editorial Team brings you the latest information of DAM and PIM, and a new perspective of project management.
【Visual Processing Japan】
Our core products, CIERTO DAM and PIM helps you to manage, product and distribute data in the smartest way.